The Bronx facility

745 E 141st Street. One of four borough facilities that will replace Rikers, near the Bronx courts and the families and services people rely on.

Track Bronx commitments Construction updates

Rendering of the Bronx facility: glass towers above a low base with ground-floor storefronts, street trees, and a plaza at the corner

The building

About the Building

The Bronx facility will hold people with cases from the Bronx close to the borough's courts, so they can stay connected to lawyers, family, and services while their case moves forward.

Rendering of the Bronx facility at sunset: glass towers above a curved base, framed by the underside of the expressway
The facility at sunset, seen from under the elevated expressway
Where is it?
745 E 141st Street, Bronx
Get directions (opens in a new tab)
How big is it?
1,040 beds
Community space
40,000 sq ft of street-level community space, distinct from the jail and with its own entrance. Its community purposes and services will be developed with local feedback.
When will it open?
Scheduled to open in 2031.
Who do I contact about construction?
Community Construction Liaison: 914-819-2153, [email protected]. Site trailer at Concord Avenue and 142nd Street.
When are community meetings?
Dates and advisories are posted with the construction updates below.

The plan

Where this fits in The plan

The four borough facilities are one part of the plan to close Rikers. The others change how the jails are run, keep more people out of jail, and plan for the island's future.

  1. This facility

    Safer facilities

    Opening new facilities that are safer and more humane, in locations closer to courts and public transportation. This facility is one of them.

  2. Modernizing the DOC

    Restructuring and modernizing the Department of Correction to ensure that the operational challenges faced at Rikers Island are not transferred to the new facilities

  3. Fewer People in Jail

    Fewer case delays, targeted release, diversion, and fewer people returning to jail mean fewer people held, for less time.

  4. The future after closing

    Planning for the Future Reuse of Rikers Island, with a focus on climate resilience, sustainability and renewable energy.

Commitments

What the city promised The Bronx

The Points of Agreement for the Bronx, at the site and across the neighborhood. Open any commitment for the latest update, budget, and original language. Statuses are from the city's November 2026 update.

Open in the tracker
  • Delivered
  • In progress
  • Pending

At the facility site

  • POA 1 Reduced Height and Density of the Jail DeliveredComplete

    Latest update

    Plans include significant reduction from initial proposals. The design-build teams will continue to seek further opportunities for efficiency in construction.

    Budget

    POA 1 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    The final approved maximum building height is 195 feet and the maximum density is a Floor Area Ratio (FAR) of 5.4. This represents a significant reduction from the initial proposal in the Draft Scope of Work, which proposed a height of 275 feet and a density of 8.6 FAR.

    Read the full commitmentSee it on the tracker

  • POA 2 Provision of Community Facility or Commercial Space (40,000 sq ft) In progressIn progress - included in facility design-build contract

    Latest update

    The Bronx Facility contract includes the requirement to provide 40,000 square feet of space for future use as a community facility or retail space, currently undefined. The use of this space will be determined at a later time with input from the community.

    Budget

    POA 2 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    The project will include the construction of 40,000 square feet of community facility or commercial space. The City will work with the Council and the community to shape the use of this space.

    Read the full commitmentSee it on the tracker

  • POA 3 Design Consultation DeliveredComplete

    Latest update

    The city held a series of community design input workshops and Bronx Community Board 1 meetings in 2025-2026 to collect input on the Bronx Facility design as it developed. The city continues to meet regularly with Council members, Community Boards, community members, and advocates in the Bronx to discuss construction updates, and quality of life impacts.

    Budget

    POA 3 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    Upon ULURP completion, the City will provide regular updates on delivery schedule, design, and construction developments and engagement on programmatic progress to Council Members in each respective borough. The City will reconvene the Neighborhood Advisory Committees in Queens, Brooklyn, and the Bronx and the Joint Task Force in Manhattan within 60 days of ULURP passage and will hold regular meetings with updates on time lines, plans, and the like. Finally, DDC and the program management consultant will hold hands-on design engagement workshops that are timed in order to ensure community input is included in the eventual RFP(s).

    Read the full commitmentSee it on the tracker

  • POA 4 Parking In progressIn progress - included in facility design-build contract

    Latest update

    The city reduced program redundancies across all four sites including a reduction in the required number of accessory parking spaces in The Bronx to 120 spaces, thus reducing the cost of the project. The revised parking is analyzed and reflected in the April 2024 technical memorandum available on CEQR Access.

    Budget

    POA 4 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    575 accessory parking spaces for DOC staff and authorized service providers will be provided in order to limit the impact to on- street parking in the community.

    Read the full commitmentSee it on the tracker

  • POA 5 Building Articulation In progressIn progress - included in facility design-build contract

    Latest update

    Building articulation away from the future housing development is documented in the 2019 ULURP drawings and included in the Bronx Facility design-build contract.

    Budget

    POA 5 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    The Administration will modify the Bronx Special Permit Application to require building articulation away from the future housing development.

    Read the full commitmentSee it on the tracker

  • POA 6 Construction Coordination (Community Construction Liaison) DeliveredComplete, will continue through construction completion

    Latest update

    The Bronx Community Construction Liaison CCL Mobile: 914-819-2153 Email: [email protected] Site trailer: corner of Concord Avenue and 142nd Street, Bronx, NY 10454

    Budget

    POA 6 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    DDC will establish an office near each project site to provide site-specific information and address community complaints and concerns.

    Read the full commitmentSee it on the tracker

  • POA 7 Street Trees In progressIn progress - included in facility design-build contract

    Latest update

    The protection of street trees was included as requirement in the Bronx Site Preparation contract and is included as a requirement in the Facility contract. The project's design builders are required to comply with all federal, state, and local laws.

    Budget

    POA 7 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    Existing street trees will be protected, and all work would be performed in compliance with Local Law 3 of2010 and the NYC Parks Tree Protection Protocol approved by the NYC Parks Borough-specific Forester, to minimize potential adverse impacts to existing trees that will remain in place.

    Read the full commitmentSee it on the tracker

  • POA 8 Air Quality and Noise Monitoring In progressIn progress - included in facility design-build contract

    Latest update

    Air quality and noise monitoring was conducted during the Bronx Site Preparation project, and is included as a requirement in the Bronx Facility contract. The project's design builders are required to comply with all federal, state, and local laws.

    Budget

    POA 8 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    The DDC will conduct air quality and noise monitoring to limit community impacts and provide for compliance with all applicable regulations.

    Read the full commitmentSee it on the tracker

  • POA 9 Traffic Mitigation In progressIn progress - included in facility design-build contract

    Latest update

    A CTMP was included as a requirement in the Bronx Site Preparation contract and is included in the Facility Design-Build contract. Part of the CTMP will be a monitoring plan for traffic which could provide for additional traffic control measures if deemed necessary.

    Budget

    POA 9 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    A Construction Transportation Monitoring Plan (CTMP) will be initiated at the start of construction for the project work area and, if necessary, additional traffic control measures will be implemented.

    Read the full commitmentSee it on the tracker

  • POA 10 Protecting Open Space In progressIn progress - included in facility design-build contract

    Latest update

    Open space resources were not used for staging or other construction activities during the Bronx Site Preparation project. As defined in the Bronx Facility contract the project design-builder will not be permitted to use open space resources for staging or other construction activities during facility construction. staging or other construction activities.

    Budget

    POA 10 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

    Original commitment

    No open space resources will be used for staging or other construction activities.

    Read the full commitmentSee it on the tracker

  • POA 23 Encourage hiring of community residents and justice-involved New Yorkers for BBJ project In progressOngoing

    Latest update

    All BBJ construction work will be dictated by the 2021 Design-Build Buildings Project Labor Agreement that the city signed.

    Budget

    POA 23 is part of the overall allocation for the Borough Based Jails, amounting to $16.1 billion

    Original commitment

    Create construction and non-construction employment opportunities for low- and very low-income and/or justice-involved individuals (including locally near the project sites). MOCJ will partner with SBS, unions, and community-based organizations to connect and train community residents and justice-involved New Yorkers with high- quality, long- term employment and jobs related to the design and construction of the Borough-Based jails.

    Read the full commitmentSee it on the tracker

  • POA 25 Reducing Department of Correction vehicle emissions In progressOngoing

    Latest update

    In its efforts to fulfill commitments the Department made under the Borough Based Jail project to reduce vehicle emissions in its Fleet Division, DOC, in collaboration with DCAS, has been gradually replacing gas vehicles with electric or hybrid vehicles. Since June 2023, DOC has acquired additional hybrid/electric vehicles for a total of 253. This is 43% of DOC's total on-road vehicle fleet.

    Budget

    A part of DCAS fleet electrification.

    Original commitment

    To reduce emissions moving forward, DOC will seek to prioritize procurement of transport vehicles that are electric and/or operate on renewable fuel, subject to the availability of such options.

    Read the full commitmentSee it on the tracker

In the neighborhood

  • POA 11 Invest in new affordable housing for the community In progressIn progress

    Latest update

    see 11a-c

    Budget

    See 11a-c

    Original commitment

    see 11a-c

    Read the full commitmentSee it on the tracker

  • POA 11a Park Haven at East 142nd Street and St Ann’s Avenue DeliveredComplete

    Latest update

    The Park Haven project was completed in 2022.

    Budget

    Total: $33.4 million

    Original commitment

    The City issued an RFP to create affordable housing on city-owned land at East 142nd Street and St. Ann's Avenue. From that RFP, The Community Builders was selected to develop affordable housing for low-income tenants. It is scheduled to open in 2022 with a total 177 units, 50 of which will be set- aside for the formerly homeless, and 127 of which will be available through the Department of Housing Preservation and Development (HPD)'s affordable lottery system.

    Read the full commitmentSee it on the tracker

  • POA 11b 351 Powers Avenue In progressIn progress

    Latest update

    The expedited ULURP process started in February. The community board held its required hearing on 2/26 and the BP's hearing is scheduled for 3/24

    Budget

    $12M in City capital has been allocated to the project.

    Original commitment

    HPD will issue an RFP for affordable housing on 351 Powers Avenue, based on consultation with the Council Member and local community.

    Read the full commitmentSee it on the tracker

  • POA 11c 320 Concord Avenue PendingDelayed

    Latest update

    HPD approved a CP for $8M in city Capital funding for the project in FY21, and an additional $4M in FY25, but the project has experienced delays related to issues with the project GC and in obtaining additional federal approvals required to access additional funding and complete the scope of work. HPD is working with HUD to secure the necessary funding to move the project forward.

    Budget

    $12M in City capital has been allocated to the project.

    Original commitment

    HPD will issue an RFP for affordable housing on 320 Concord Avenue, based on consultation with the Council Member and local community. The affordable housing will use the 50% ELINLI HPD term sheet, and the RFP will include a preference for a grocery use. Timing: Expected issuance in 2022

    Read the full commitmentSee it on the tracker

  • POA 12 Install new lighting, cameras, and accessible play equipment at Mill Brook, Mitchel, Mott Haven, and Patterson Houses In progressOngoing

    Latest update

    Mitchel, Mott Haven, and Patterson: all completed. Construction at Mill Brook started 11/2024; projected for completion in Q4/2026.

    Budget

    $37,000,000

    Original commitment

    The city will work with NYCHA to add lighting throughout Mill Brook, cameras at Buildings 1, 2, 3, and 10 at Mill Brook, lighting and cameras at Mitchell Houses, and play equipment to be installed at Mill Brook, Mitchell, Mott Haven, and Patterson Houses.

    Read the full commitmentSee it on the tracker

  • POA 13 Study rezoning of M districts DeliveredComplete

    Latest update

    Complete

    Budget

    Performed with existing resources.

    Original commitment

    DCP commits to analyze the M districts west of the Bruckner not mapped as Industrial Business Zone (IBZ), with a focus on legalizing existing residential uses which are not complying, including the block of Concord Avenue between 141st and 142"d streets, and will report to CB1 in the next two years.

    Read the full commitmentSee it on the tracker

  • POA 14 Invest in a new community center at 1080 Ogden Avenue In progressIn construction (anticipated completion end of 2027)
    FDNY

    Latest update

    The new building for EMS 17 is in the early stage of construction. Department of Design of Construction estimates the new building will be ready for occupancy in 2027. Once the new building is completed, FDNY will then be able to vacate the Ogden Avenue building.

    Budget

    $42 million (design and construction)

    Original commitment

    Following the Fire Department of New York (FDNY) relocation of its EMS Station 17 from 1080 Ogden Avenue, the City will transform the site into a new community center with a range of programming developed in consultation with the local community. The City will also allocate $18M in funds to support the construction of the new hub in addition to any private, Council, state, or federal funding that may be allocated to the project.

    Read the full commitmentSee it on the tracker

  • POA 15 Fund a new youth services center at 337 East 139th Street PendingPending

    Latest update

    40th Precinct has been relocated; the city will work with community and councilmember to advance this project as other sources of funding become available.

    Budget

    Not stated in the latest update

    Original commitment

    Following the relocation of the 40th Precinct operations from its current building at 257 Alexander Avenue to 567 East 149th Street, the City will competitively procure and work with a provider to create a youth services hub at 337 East 139th Street, the parking lot currently used by the 40th Precinct. The city will also allocate $15M in funds to support the construction of the new hub in addition to any private, Council, state, or federal funding that may be allocated to the project.

    Read the full commitmentSee it on the tracker

  • POA 16 Fund programming at a new Senior Center at Mill Brook Terrace DeliveredComplete

    Latest update

    Mill Brook is now a full-fledged Older Adult Center operated by West Side Federation of Senior and Supportive Housing, Inc. (WSFSSH). Under their OAC contract, WSFSSH provides congregate meals, health promotion services, nutrition education, case assistance and information, and telephone reassurance. The OAC's current average daily participation is 99.

    Budget

    Contractually funded at $600,000

    Original commitment

    Subject to the developer entering into a contractual agreement with the City for the space, funding will be provided to support the programming at a new senior center at Mill Brook, scheduled to open in spring 2020.

    Read the full commitmentSee it on the tracker

  • POA 17 Upgrade community centers at Mill Brook, Mitchel, Mott Haven, and Patterson In progressOngoing

    Latest update

    Mott Haven/Mill Brook/Mitchel/Patterson. The work continues with funding approval, pre-construction and abatement processes. Patterson: projected for completion in Q3/2028 Mitchel: projected for completion in Q3/2029 Mott Haven: projected for completion in Q2/2029 Mill Brook: projected for completion in Q1/2028

    Budget

    $29,895,209.26

    Original commitment

    The City will work with NYCHA to upgrade the facilities at four developments near the borough-based jail system sites. Renovations will address needs identified in the last Physical Needs Assessment. These include:

    Read the full commitmentSee it on the tracker

  • POA 17a Mill Brook community center upgrade In progressOngoing

    Latest update

    The team is continuing with filling process as part of construction phase.

    Budget

    $4,567,738.92

    Original commitment

    Renovations will address interior common area bathrooms and finishes, stairs, and lighting fixtures.

    Read the full commitmentSee it on the tracker

  • POA 17b Mitchel community center upgrade In progressOngoing

    Latest update

    The team is continuing with filling process and abatement processes as part of the construction phase.

    Budget

    $10,497,543.51

    Original commitment

    Renovations will address roof replacement, common area bathrooms and kitchens, and gymnasium.

    Read the full commitmentSee it on the tracker

  • POA 17c Mott Haven community center upgrade In progressOngoing

    Latest update

    The team is continuing with funding approval, Vendor Name Check (VNC) processes as part of the Procurement process.

    Budget

    $8,094,101.11

    Original commitment

    Renovations will address roof replacement, common area kitchens and finishes, stairs, electrical service switch, and air conditioning system at the day care center

    Read the full commitmentSee it on the tracker

  • POA 17d Patterson community center upgrade In progressOngoing

    Latest update

    The team is continuing with filling process and abatement processes as part of the construction phase.

    Budget

    $6,735,825.72

    Original commitment

    Renovations will address interior common area kitchens, finishes, and, security alarms.

    Read the full commitmentSee it on the tracker

  • POA 18 Expand youth programming at Mill Brook, Mitchel, and Patterson Houses DeliveredCompleted and services ongoing

    Latest update

    Complete

    Budget

    Not stated in the latest update

    Original commitment

    In order to expand youth programming at these three NYCHA developments to include teens and adults, the City will fund three Cornerstone programs to provide high- quality, year-round programs at Mill Brook, Mitchel, and Patterson. An RFP will need to be issued to procure for these programs.

    Read the full commitmentSee it on the tracker

  • POA 19 Provide space for evening basketball at a local school DeliveredCompleted and services ongoing

    Latest update

    Community School District 7 has a school based and NYCHA based (DYCD) Department of Youth & Community Development Saturday Night Light programs. (SNL) NYCHA based programs have the SNL component running in continuation of existing Cornerstone programming there. There is currently a DYCD Saturday Night Lights program in Patterson Houses, it is operated by East Side House, this CBO also operates a Cornerstone and a COMPASS program there as well. Here is some background on the DYCD-SNL programming. https://www.nyc.gov/site/safestbigcity/keep-nyc-safe/saturday-night-lights.page

    Budget

    Not stated in the latest update

    Original commitment

    The DOE will work with local principals and Patterson Houses Tenant Association to identify a space for local youth to play basketball in a safe space during some weeknight evenings and assist with the permitting process.

    Read the full commitmentSee it on the tracker

  • POA 20 Invest in capital improvements to Samuel Gompers High School DeliveredComplete

    Latest update

    Bathrooms: Complete. Gym: Complete. Cameras: Complete.

    Budget

    $3.775 million

    Original commitment

    DOE will invest in capital improvements to renovate the bathrooms, replace the gym bleachers, repaint the gym ceiling, and install 30 new security cameras at Gompers High School.

    Read the full commitmentSee it on the tracker

  • POA 21 Invest in technology upgrades at P.S. 65 DeliveredComplete

    Latest update

    complete

    Budget

    Not stated in the latest update

    Original commitment

    DOE will work with the principal to identify new technology needs, and funding will be provided for 10 smart boards or the equivalent (e.g. brand new computers with monitors, etc.). Resources from the Smart Schools Bond Act will be disbursed over three years, starting this school year.

    Read the full commitmentSee it on the tracker

  • POA 22 Support P.S. 65 and other neighborhood schools in securing additional resources DeliveredComplete

    Latest update

    Complete

    Budget

    Not stated in the latest update

    Original commitment

    The Bronx Plan offers schools innovative grant funding, and provides salary differentials for hard-to-staff positions to help with staff recruitment and retention. The DOE will work closely with the P.S. 65 principal and chapter leader to assess interest in the program and encourage them to apply. DOE will additionally conduct outreach to eligible schools in Council District 8 to ensure a robust response to the next round of the Bronx plan.

    Read the full commitmentSee it on the tracker

  • POA 24 Invest in pedestrian improvements to the 138th Street corridor DeliveredComplete

    Latest update

    Complete

    Budget

    The budget allocation for HWCSCHPBX is $8.7 million. It was completed in 2025.

    Original commitment

    DOT will add benches at the intersection of St. Ann's Avenue and East 138th Street and wayfinding signage on 138th Street between St. Ann's Avenue and 3rd Avenue. In addition, DOT will construct three concrete curb extensions on northwest, southwest, and southeast comers of East 138th and St. Ann's Avenue to shorten crossing distances, control vehicle turning, and improve pedestrian visibility and safety. At the intersection of East 138th Street and Willis Avenue, DOT has added signal phasing to improve the intersection's western crosswalk and 2-way bicycle lane, prohibited south- bound left turns to improve the intersection's eastern crosswalk, installed pedestrian island to shorten the southern crosswalk and slow vehicle turns and installed left-tum traffic calming at the northern crosswalk to slow vehicle turns. DOT will continue to work with the Councilmember's office to develop safety improvements along 3rd Avenue, including at the intersection of 138th Street and 3rd Avenue.

    Read the full commitmentSee it on the tracker

  • POA 26 Invest in violence reduction initiatives in additional areas in the South Bronx DeliveredCompleted and services ongoing

    Latest update

    DYCD's MAP program expanded to Patterson and Mitchel Houses in 2022

    Budget

    Not stated in the latest update

    Original commitment

    As described in the previous section, the City will allocate funding to add and expand Cure Violence initiatives at Patterson, Mitchell Houses, and Wagner Houses.

    Read the full commitmentSee it on the tracker

  • POA 27 Vernon C. Bain Center DeliveredComplete

    Latest update

    The Vernon C. Bain Center was closed in 2023. The center was unmoored and tugged to Louisiana on November 3, 2025.

    Budget

    Performed with existing resources.

    Original commitment

    The City commits to closing the Vernon C. Bain Center, colloquially known as "the barge," by the time all jail uses are removed from Rikers, scheduled to be 2026.

    Read the full commitmentSee it on the tracker

Construction

Current Construction updates

Current construction advisories, community meeting dates and project updates are posted on the borojails website.

Questions

Bronx questions

Why is the city building a facility in the Bronx?

Closing Rikers means replacing it with a smaller system in the boroughs. A Bronx facility keeps people near the Bronx courts, their lawyers, and their families, instead of on an island that is hard to reach.

When will the Bronx facility open?

The Bronx facility is scheduled to open in 2031.

How will the Bronx community space be used?

The facility contract requires 40,000 square feet of street-level community space, distinct from the jail and with its own entrance. Its community purposes and services will be developed with local feedback.

Who do I contact about Bronx construction?

The Bronx Community Construction Liaison: 914-819-2153, [email protected]. The site trailer is at the corner of Concord Avenue and 142nd Street.

All questions and answers

Archive

From the Bronx archive

Construction bulletins, monitoring reports and meeting materials the program published about this site, kept for the record.

265 items, newest first · page 1 of 34

Open the full archive in Resources

all four

Borough-based jails

A fundamental component to the closure of Rikers Island is developing the capacity to house individuals in custody of the Department of Correction off-island, in facilities that are safer and more humane.

See all four facilities Read the full report