Latest update
The protection of street trees was included as requirement in the Bronx Site Preparation contract and is included as a requirement in the Facility contract. The project's design builders are required to comply with all federal, state, and local laws.
Status as reported
In progress - included in facility design-build contract
Lead agency
DDC
Budget
POA 7 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.
Original commitment
Existing street trees will be protected, and all work would be performed in compliance with Local Law 3 of2010 and the NYC Parks Tree Protection Protocol approved by the NYC Parks Borough-specific Forester, to minimize potential adverse impacts to existing trees that will remain in place.