The hydraulic analysis was completed in January 2020 and DDC/DEP are in conversations about potential sewer system upgrades in the area. The environmental review of the project found that the increase in wastewater flow resulting from the approved project would not create a significant adverse impact on the city's combined sewer system or the sewage treatment system.
Status as reported
Ongoing
Lead agency
DDC
Budget
Pending final determination by DEP.
Original commitment
A hydraulic analysis will be conducted during design and if it is determined that the existing sewer system is incapable of supporting the increase in wastewater flow, the existing sewer system will be upgraded.