Bronx ยท POA 5

Building Articulation

In progressIn progress / Committed to contract

Latest update

Building articulation away from the future housing development is documented in the 2019 ULURP drawings and included in the Bronx Facility design-build contract.

Status as reported

In progress - included in facility design-build contract

Lead agency

DDC

Budget

POA 5 is part of the overall allocation for the Bronx Borough Based Jail, amounting to $2.972 billion.

Original commitment

The Administration will modify the Bronx Special Permit Application to require building articulation away from the future housing development.

See it on the tracker See it on the map All Bronx commitments